3 ms·
Hydrological cycles are measured in decades/centuries. Ideally, you’d start siting solar and batteries near Hoover Dam to rely on existing transmission infra. N
by toomuchtodo 4y ago
Hydrological cycles are measured in decades/centuries. Ideally, you’d start siting solar and batteries near Hoover Dam to rely on existing transmission infra. Nameplate capacity is roughly 2GW, so lots of transmission capacity available. Boulder City (to the SW of Hoover Dam) has some solar generation resources already, unsure if that area is close enough though. TLDR Plan for dead pool and inability to generate hydro power.