3 ms·
I wasn't, I'm including panel and wiring under materials cost, but some component of the $4500 panel replacement will be labor. Panels cost around $250, but th
by linsomniac 4y ago
I wasn't, I'm including panel and wiring under materials cost, but some component of the $4500 panel replacement will be labor. Panels cost around $250, but then you need to upgrade the meter base, add an external disconnect (now code), upgrade ~5ft of aluminum from meter base to panel) and then swing over and reconnect all the circuits (high labor). There's also a city component for service upgrade. Then there's the components related to the solar grid tie.
I understand that how I initially phrased it sounded like maybe I was bundling that into labor.