3 ms·
I hope that point 1. applies to hydro. They should be required to post a bond that covers fully everything downstream from them with possible catastrophic worst
by Ekaros 4y ago
I hope that point 1. applies to hydro. They should be required to post a bond that covers fully everything downstream from them with possible catastrophic worst scale failure. And keep increasing it when more is constructed.