3 ms·
I've seen those signs during construction works on the local tram system where they've switched off sections of the overhead line equipment – at least in those
by iggldiggl 4y ago
I've seen those signs during construction works on the local tram system where they've switched off sections of the overhead line equipment – at least in those cases the switch handles are also protected with a padlock.