3 ms·
> It works out to around 80 gigawatt hours per cubic meter and most of that material is silicon. By comparison a nuclear powerplant goes through around 240 kg o
by tsimionescu 4y ago
> It works out to around 80 gigawatt hours per cubic meter and most of that material is silicon. By comparison a nuclear powerplant goes through around 240 kg of uranium to generate that much power.
Well, one cubic meter of uranium is ~19000 kg, so not sure what your point was.
- Retric 4y agoThe point was Silicon isn't rare, it’s 28% of earths crust. If ~99.5% of the 1 cubic meter is silicon then, the rare bits assuming uranium density are ~95kg which is less than 240kg of uranium.
- natmaka 4y agoThere is a gorilla in this room: the more we obtain uranium (prospecting, mining, milling...), the more we add to the associated carbon footprint. Known reserves or uranium may provide for the current reactor fleet at best for the upcoming 200 years. Therefore a sustained growth of installed nuclear capacity will lead us to exploit mines at always lowering ore grades => more emissions. https://papers.ssrn.com/sol3/papers.cfm?abstract_id=2051332 https://papers.ssrn.com/sol3/papers.cfm?abstract_id=2051332 https://www.researchgate.net/publication/222817608_Life_cycle_energy_and_greenhouse_gas_emissions_of_nuclear_energy_A_review https://www.researchgate.net/publication/222817608_Life_cycl...