2 ms·
I'll wait to see what Construction Physics[1] says about it. He has covered the prefab space in detail. [1] https://constructionphysics.substack.com/ https://c
by euroderf 4y ago
I'll wait to see what Construction Physics[1] says about it. He has covered the prefab space in detail.
[1] https://constructionphysics.substack.com/ https://constructionphysics.substack.com/
- manholio 4y agoAs an avid reader, I anticipate the feedback as "unlikely to scale, since the centralized productivity gains don't outweigh the diminished flexibility and substantial transport costs". This is a recurring theme with prefab system he analyzes, they scrape by employing labour arbitrage at a cheap production site, but do not unleash the productivity gains we associate with industrial production. This becomes obvious when you look at the distribution of construction costs for a finished building: https://constructionphysics.substack.com/p/construction-cost-breakdown-and-partial https://constructionphysics.substack.com/p/construction-cost... The most a prefab can hope to achieve is attack maybe 30- 40% of the total costs in that pie chart. You cannot prefab electrics and plumbing, foundation, landscaping, permitting etc. So even if they crush it and get 100% improvement on their products compared to on site build, that's still a 20% at best overall cost improvement. Bit with that comes the risk of a new and unproven system, costly coordination issues that are easy to rectify in the traditional method - but if the wrong prefabs are shipped across the country you are dead for a few weeks, since the next stage cannot start.