If you have a consistent supply of something then a slow but lower cost delivery method is entirely sensible, as is switching to higher cost but faster methods
by ZeroGravitas 4y ago
If you have a consistent supply of something then a slow but lower cost delivery method is entirely sensible, as is switching to higher cost but faster methods when there have been interruptions.
The story also mentions that their internal plans are for lower spec items.
- moooo99 4y ago> If you have a consistent supply of something then a slow but lower cost delivery method is entirely sensible, as is switching to higher cost but faster methods when there have been interruptions. It might make sense from an economical point of view, but not from a resilience point of view. Ignoring the chip shortages over the last two years, there have been major disruptions in ocean freight logistics. Given the relatively high value density and the crucial role of these components in the vehicle manufacturing process, making air-freight the default would have been a sensible choice as well. Despite the feasibility of alternatives
- ZeroGravitas 4y agoThe problem isn't that a ship got delayed with the chips on board, they threw out months of production at the factory due to a flaw before shipping them. So switching to air freight now is just boring and sensible (and would also work if a ship got delayed too, meaning the cheaper option is basically risk free).
- snewman 4y agoEven with consistent supply, for a high value low weight item, ocean shipping does not make sense simply from a time value of money perspective. Also, it makes planning that much more difficult, you have to adjust orders that much farther in advance.
- smachiz 4y agoNot really true - depending on volume. In almost all certainty they have volume commitments out months - and have for at least two years. JIT stopped being a reality a while ago. If you know you're sitting on 2 months of inventory, and you're getting shipments that are equal to 1 month of capacity every month, and it takes 3-5 weeks by sea, it's a perfectly reasonable thing to do still. Also, depending on their contracts, they may not pay the vendor until they receive the goods at their location, so the sea freight shipment doesn't have a cost for time value of money. If you're sitting on a buffer, time value of money doesn't matter - and only gets worse by spending more money to get it sooner if you can only produce say 5k cars/week - doesn't matter if you get parts sooner you can't use.
- uoaei 4y agoWith semiconductor manufacturing, you are in a dance where customers need products now but your lead times can be weeks or months. This has always been true, even pre-pandemic. Customer demand forecasting is a huge deal in this space, since they still pursue "lean planning" and "JIT production" as much as possible to out-compete on delivery times and volumes. Inventory costs are necessarily minimized in this framework, with all the supply hiding further back in the chain. Once the products are done, they're packaged and shipped; there is basically no buffer. So you don't have resilience of that sort, though you do have a significant off-ramp (in terms of the products still in process) to help adjust to market shocks if necessary. Instead of this kind of inventory-buffer plan common in Western economists' and analysts' assumptions, you have instead resilience in the relationships between you and your customer and the stability that confers. Because the supply chains are so long and complex between semiconductor manufacturers and their customers, it pays to keep good relations with your supplier (and with your customer). So account managers and supply planners are very careful not to cancel orders or adjust delivery dates so as to maintain that congenial relationship. This is the main lesson higher-ups learned from their time spent playing the Beer Game[1]. Source: worked in Infineon's logistics and supply chain department [1] https://beergameapp.com/ https://beergameapp.com/
- fomine3 4y agoGenerally agree, but I think 2022 isn't the case of "consistent supply".