3 ms·
5nm is still the bleeding edge, and chip fab machines can be replaced.
by tintor 4y ago
5nm is still the bleeding edge, and chip fab machines can be replaced.
- ip26 4y agoIt won’t be by the time the fab is up and running. Of course, I find that easy to forgive- when booting up a completely new locale, start with what you know.
- ElectricalUnion 4y agoIt will also be comming online on a wave of excess silicon capacity fuelled by the then-current silicon drought. On a possibly drier climate, competing for water resources.
- sylware 4y agoyeah, I implied mid-rand chips when the foundry will actually be in production run, namely in years, or when the 2/3nm chips will really be rolling.