3 ms·
To me, it's about the shape of the logistic curve from planning, through construction to supply, and it's lifetime. We should start nuclear construction now, b
by ggm 4y ago
To me, it's about the shape of the logistic curve from planning, through construction to supply, and it's lifetime.
We should start nuclear construction now, but for supply in 8+ years time. And therefore we should start increasing construction of wind, solar, pumped hydro and battery now, to supply lower watts, but useful watts inside the 8 year window. As supply matches demand we can remove coal and gas, and when the nuclear comes on line, increase the pace of their removal and repurpose surplus wind and solar to hydrogen production for ammonia, and hydrogen fuel cells, and domestic gas replacement.
- kuhewa 4y agoWe should do some of all of that, I agree in large part (along with some diversified storage), the issue as the parent comment pointed out is who is going to stake billions on what looks like it will be a risky and poor ROI with significant construction delays and cost overruns. Would be easier for China