4 ms·
1.5MW * (24365) 20 year working life ~= 262,000 MWh. $25M -> ~$100/MWh. Much better than I would have thought for a pilot.
by spenrose 4y ago
1.5MW * (24365) 20 year working life ~= 262,000 MWh. $25M -> ~$100/MWh. Much better than I would have thought for a pilot.
- googlryas 4y agoWhat about operational costs? Downtime? I assumed the £20M was about R&D and production, not operation.