3 ms·
Put a replacement PSU, a few fans and a small box of replacement drives in the same order. edit: Make that 2 PSUs just to be sure...
by baq 4y ago
Put a replacement PSU, a few fans and a small box of replacement drives in the same order.
edit: Make that 2 PSUs just to be sure...
- Nextgrid 4y agoThis will be hosted by Hetzner, OVH or a suitable equivalent, so the “SLA” is based on assuming that they’ll rectify any hardware failures within 2 days. I this case I’ll gamble on backups with the idea that in the worst case scenario it takes us less that an hour or rebuild the machine on a different provider such as AWS. The machine itself is only really required for a few days every quarter, with a few days’ worth of leeway if we fail. Therefore I feel this is a acceptable risk.