4 ms·
There's maybe some connection: Due to the 9-Euro-Ticket there were (in my experience) often delays in regional trains (mostly due to trains being too full). Reg
by schroeding 4y ago
There's maybe some connection: Due to the 9-Euro-Ticket there were (in my experience) often delays in regional trains (mostly due to trains being too full). Regional trains share the infrastructure with high-speed trains. So I would find it believable that they influence each other.
But yeah, it wasn't great beforehand, the trend was already there and it's not the 9-Euro-Tickets fault, IMO.
> I think the core problem is huge and extremely traditional management.
IMO a big part is also the neglected infrastructure. Many trains are new and old rolling stock is being upgraded, station buildings are being renovated, but the tracks and the signaling is often very old. There is just so much you can do when your (station) signaling still uses relays from the 60s.
- mschuster91 4y ago> There is just so much you can do when your (station) signaling still uses relays from the 60s. That's modern. About a quarter of the network still uses purely mechanical signalling and switch operations - that technology is literally and in every sense from the era of the German Kaiser Reich days.
- schroeding 4y agoTrue (and there is a nice video from Tom Scott[1] where he uses one of those things), but almost no high-speed trains[2] use those parts, AFAIK. [1] https://www.youtube.com/watch?v=6TLcaJdsRr0 https://www.youtube.com/watch?v=6TLcaJdsRr0 [2] with the exception of a few "weird" Intercitys that take very strange routes to reach tourist destinations like Berchtesgaden
- iggldiggl 4y agoAs one counterexample is enough to disprove your "[2]" :-) : Until it'll be bypassed by the new Rastatt tunnel, there's at least one mechanical signal box left between Karlsruhe and Offenburg (Durmersheim) which sees regular and frequent intercity traffic. Until very recently there used to be another one immediately north of it (Forchheim) [1], but due to the construction works for the junction with the new high-speed line it was replaced with a new computer-based interlocking in 2018. [1] And a mechanical block post in-between, but that one was more or less permanently switched out and was probably last used in 2009, when during construction works the parallel line via Ettlingen was closed,
- schroeding 4y agoWow! I stand corrected :D
- iggldiggl 4y agohttps://stellwerke.info/ https://stellwerke.info/ has a good overview, and I think by now it's also quite comprehensive. If you look at the map, filter for active signal boxes only and also remove "Elektrische Stellwerke" from the default filter, you might be able to discover whether the are any other mechanical or electro-mechanical signal boxes left on any of the main intercity routes. (And since you mentioned Berchtesgaden: It looks like that whole line was switched to ESTW-operation (for non-Germans: computer-based interlockings) in November last year.