3 ms·
Fair enough. I too long for the day the metro crosses jaydeva hospital... The folks at BMRCL are building a 5 layer system there (1 underpass, 1 flyover, 1 stre
by samarthr1 4y ago
Fair enough.
I too long for the day the metro crosses jaydeva hospital...
The folks at BMRCL are building a 5 layer system there (1 underpass, 1 flyover, 1 street level, 2 levels of metro as there is a changeover at jaydeva).
The fun part is that the part of the line after silk board (down south, towards hosur) is done, and is billed to start operations this year.