3 ms·
Yes, newer ones don’t have the same problem, since they are not held back by the rules of a union. Sadly those are few and far between, and I haven’t heard of a
by thecompilr 4y ago
Yes, newer ones don’t have the same problem, since they are not held back by the rules of a union. Sadly those are few and far between, and I haven’t heard of a new railroad line since the yet to be finished CHSR, though can’t blame that one on the unions.
- inferiorhuman 4y agoDude. What the fuck are you on about? BART and Muni are both union shops. I don't know if SMART is but it postdates the HSR proposals. As someone who lived through Muni's transition to SelTrac (the system that underpins DLR and I think some of the Tube lines) I can say the union was not the problem. The technology was unreliable and eventually abandoned by Alcatel/Thales. GoA 4 stuff is only viable along small, low ridership stretches of track. If you knock the level of automation down a peg or two it's a lot easier to scale up to busier/larger systems.