This is what always worries me about our home server. It's running ZFS with multiple redundant drives but the supplier refused (when I explicitly asked) to supp
by Silhouette 4y ago
This is what always worries me about our home server. It's running ZFS with multiple redundant drives but the supplier refused (when I explicitly asked) to supply it with disks known to be from different batches claiming that the odds of multiple failures close together were negligible. Obviously we have backups as well but the time and cost to restore a full server from online backups can be significant.
- dredmorbius 4y agoWithin an earlier thread "Tell HN: HN Moved from M5 to AWS", there's an excellent comment by loxias about risk diversification across multiple factors. Well worth reading: https://news.ycombinator.com/item?id=32031655 https://news.ycombinator.com/item?id=32031655 I've increasingly come to view systems operations / SRE as a risk management exercise, where the goal is to reduce the odds of a catastrophic failure. Total system outage is one level, unrecoverable total system outage is even worse. Having multiple redundant backups / storage systems, in different locations, with different vendor hardware / stacks, all helps reduce risk of a single-factor outage. Though complexity risk is its own issue.
- kqr 4y ago> I've increasingly come to view systems operations / SRE as a risk management exercise, where the goal is to reduce the odds of a catastrophic failure. s/reduce/find an appropriate level for/ It's a common misconception that risk management and risk reduction are synonyms. Risk management is about finding the right level of risk given external factors. Sometimes that means maintaining the current level of risk or even increasing it in favour of other properties.
- dredmorbius 4y agoMy point is that risk is central to systems management. If you look at earlier standard texts on the subject, e.g., Nemeth or Frisch, the concept of risk is all but entirely missing. I've numberous disagreements with Google, but one place where I agree is that the term SRE, systems reliability engineer, puts the notion of managing for stability front and centre, and inherently acknowledges the principle of risk. I've since heard from others that this is in fact how the practice is presented and taught there. Quibbling over whether the proper term is risk management or risk reduction rather spectacularly misses the forest for the trees.
- kqr 4y agoOkay, fair enough. To me, the risk involvement is so obvious (to any serious business function!) that I find the management/reduction distinction a more important point. But I can see it your way too.
- dredmorbius 4y agoThanks. I don't know how long you've been in the business, but the change seems a relatively recent one, one that wasn't manifestly obvious to me, and one that has pretty much always seemed difficult to communicate to management. Whether that's because business management is often about ignoring risks or treating it as inconvenient, or if I've just had a long string of bad bosses, I'm not sure. I did make a point of looking through several of the books that were formative for me (mostly 1990s and 2000s publication dates), and there's little addressing the point. Limonchelli's book on time management for sysadmins was a notable departure from the standard when it came out, in 2008. I'd say that marked the shift toward structured and process-oriented practices. That was about the time of the transition from "pets" to "cattle" (focus on individual servers vs. groups / farms), but pre-dates the cloud transition.
- kqr 4y agoYou know what? You're right again! The stuff I've read that touches on this idea is almost all from 2006 and onwards, mainly 2010s. The earliest example is a bit of an outlier: Douglas Hubbard's 1985 How to Measure Anything -- but it's also only tangentially related. The other real exceptions are books on statistics (where the idea of risk management -- at least in my collection -- seems to have gotten popular in the 1950s, probably as a result of the second World war) and financial risk management (which seems to really have taken off in the 1980s, probably in conjunction with options becoming a thing.) Statisticians and finance people (and by extension e.g. poker and bridge players) have known this stuff for a while. Of course, hydrologists have been doing this stuff since the early 1900s at least, but extreme value theory has always been a kind of niche so I'm not sure I should count that. ---- That said, I did mention it was obvious to me. I still find it hard to convince management and colleagues of its importance...
- gfrff 4y agoOne of the advantages startups have is higher risk tolerance than branded megacorporations. Data, customers, brand, employees, law suits, or cynically, human lives.
- dredmorbius 4y agoThe risk-tolerance of startups is illusory. The risk is being managed at the VC/investor level, by diversifying investment bets over numerous early ventures. The death of any one of those isn't a concern for the VC, if the portfolio performance is sufficient. Of course, for the individual venture and employees, that risk is disaggregated. More rigorous systems practices are seen as an impediment to early growth with any potential problems either something that can be ironed out later, or simply a post-liquidation concern that doesn't factor into the investors' interests at all.
- gfrff 4y agoThe risk tolerance is there result of not potentially taking out $1T of additional value if you f-- up a small project at a mega corporation. At a mega corporation, you can't take risks which make complete sense for the project you're on independent of uncapped liability for the mothership. There are misalignments like the one you describe but that's not what I'm talking about.
- no-s 4y ago> It's a common misconception that risk management and risk reduction are synonyms. Risk management is about finding the right level of risk given external factors. Sometimes that means maintaining the current level of risk or even increasing it in favour of other properties. What’s funny is I seem to have to explain this to senior management anew every 6-7 years. I know they teach it in management school, but it in the real world somehow people fall into the false equivalence when they get promoted. Often they adopt a cartoonish view of things because they can’t get the quantitative signals and everything decision effectively reduces to what I ironically term as anecdotal analytics. I have this amusing heuristic for risk acceptance which I often use to help people approach decisions: you should kick the decision up to someone with higher authority if your signing authority is less than: risk coefficient times quantified exposure, less mitigation cost where mitigation is within signing authority AND/OR budgeted and authorized spend. I like to view mitigation and opportunity cost/benefit in a similar way so I have some idea of equivalences when evaluating tradeoffs. It’s not original with me, I must have lifted it from some decades-past HBR article or 60’s rant on quantitative business management. I could rant on various aspects of risk management application all day, thank goodness I've managed to quit before I really got started sharing...in my experience it’s been very helpful when applied in real world engineering implementations.
- no-s 4y ago> Total system outage is one level, unrecoverable total system outage is even worse. Ha, I used to suggest people consider “total failure of business” in exposure quantification...
- colejohnson66 4y agoIf you’re willing to wait, you can always order half, wait a month or two, then order the other half.
- Silhouette 4y agoUnfortunately this particular server was a replacement for another that had failed suddenly so that wasn't really an option in my case. If it had been one of many at work then it would have been a sensible option, I agree.
- dredmorbius 4y agoRepurposing several of the initial drives with later purchases (or exchanges) might be another option.
- cyphar 4y agoMy solution is to use a different manufacturer for each drive in a mirror. The prices are usually pretty similar and you get to make sure that one firmware bug doesn't kill your entire pool.
- Hamuko 4y agoI decided to employ this tactic when I was setting up my new NAS and needed two drives. Upside was that I could definitely know they weren't from the same batch. Downside was that I had to buy a Seagate, and I don't have good experiences with Seagate since my only Seagate drive had died an early death at the tender age of 3. Turns out that this was very much a downside since the Seagate drive died at the tender age of 16 months.
- cyphar 4y agoI had a series of WD drives that failed, and I managed to get them all replaced under warranty since they died within 3-5 years. I don't buy WD drives anymore but it wasn't the end of the world since I had spares while I waited for the replacement drives to be shipped. Anecdotally, I haven't had issues with Seagate but I'm sure it really boils down to which exact drives you're using and what batch they were in.
- mst 4y agoPick a manufacturer and you'll be able to find plenty of horror stories. Some may be worse than others but diversification is the right answer anyway.
- jaclaz 4y agoPossibly the supplier was talking of hardware failures. The issue here (as it was several years ago with the re-known Seagate 7200.11 issue [0]) is not about the odds of multiple (hardware) failures together (which may actually be a very rare case), in these case it is essentially a software failure, a counter that crashes the on-disk operating system (if we can call it so) be it an overflow of the counter or hitting a certain value. The chances of having almost simultaneous failures is near to certainty for drives that are booted the same number of times and have been powered for the same number of hours, if the affected counters are related to these events. [0] Some reference: https://msfn.org/board/topic/128807-the-solution-for-seagate-720011-hdds/ https://msfn.org/board/topic/128807-the-solution-for-seagate... >Root Cause This condition was introduced by a firmware issue that sets the drive event log to an invalid location causing the drive to become inaccessible. The firmware issue is that the end boundary of the event log circular buffer (320) was set incorrectly. During Event Log initialization, the boundary condition that defines the end of the Event Log is off by one. During power up, if the Event Log counter is at entry 320, or a multiple of (320 + x*256), and if a particular data pattern (dependent on the type of tester used during the drive manufacturing test process) had been present in the reserved-area system tracks when the drive's reserved-area file system was created during manufacturing, firmware will increment the Event Log pointer past the end of the event log data structure. This error is detected and results in an "Assert Failure", which causes the drive to hang as a failsafe measure. When the drive enters failsafe further update s to the counter become impossible and the condition will remain through subsequent power cycles. The problem only arises if a power cycle initialization occurs when the Event Log is at 320 or some multiple of 256 thereafter. Once a drive is in this state, there is no path to resolve/recover existing failed drives without Seagate technical intervention. For a drive to be susceptible to this issue, it must have both the firmware that contains the issue and have been tested through the specific manufacturing process.