3 ms·
7. 7! This is by far the one that resonates with me the most. But for some reasons SREs think the opposite is true: the longest it takes to get to prod, the bet
by etamponi 4y ago
7. 7! This is by far the one that resonates with me the most. But for some reasons SREs think the opposite is true: the longest it takes to get to prod, the better. What a pain.
- ryanklee 4y agoI'm an SRE and currently on a mission to get code into prod as fast and safely as possible. Instead of painting such a broad, generic negative picture, maybe articulate an actual position to argue against.
- deleted 4y ago[deleted]
- etamponi 4y agoYou are right -- I was referring specifically to SREs in FAANG, which enforce a mandate of maximum 1 deploy to prod per day -- in some case even 1 per week, or less. To be honest, I think there is a threshold, perhaps expressed in terms of risk of losing money, at which it is more beneficial to delay deploys. But applying the same deployment rules to a multi-billion-dollar revenue machine and to a smaller project with perhaps a few thousand weekly users is ridiculous.
- ryanklee 4y agoThanks for the clarification, I can see how that might be frustrating.