2 ms·
Expensive is relative. California HSR, mostly above ground, is going to cost $80 b for the section scheduled to be built (119 miles) and if the full 500 mi arri
by renewiltord 4y ago
Expensive is relative. California HSR, mostly above ground, is going to cost $80 b for the section scheduled to be built (119 miles) and if the full 500 mi arrives at the current $105 b we'll be lucky. Gotthard Base Tunnel was 35.5 miles and $12.5 billion equivalent.
So the best case is $210 million / mile for the CA HSR and the Swiss already built a tunnel for $350 million / mile.
It looks like they can dodge the topography by building at the cost somewhere between close-to-best-case American rail and worst-case American rail.