3 ms·
An automated system could be made for this. Imagine two tracks side by side. Now have a mechanism above that lifts goods off one train and into another. The
by londons_explore 4y ago
An automated system could be made for this.
Imagine two tracks side by side. Now have a mechanism above that lifts goods off one train and into another. The mechanism could work on moving trains such that a 30 mph train could unload all its cargo and have it all loaded into a neighbouring train also moving at 30 mph.
Such a mechanism would be expensive, but only needs to exist at cargo borders, and the cost would be dwarfed by the value of the trade it enables.
- Tabular-Iceberg 4y agoWhat's the benefit of moving during the operation? It seems like it would add a lot of cost and complexity for no clear benefit.
- inglor_cz 4y agoThere isn't any benefit, it only eats up capacity of two tracks that could be used by other, faster trains. If you need to move cargo from one train to another, just do it somewhere away from the main tracks.
- wongarsu 4y agoSomething like a container crane? I'd argue even that is too complicated. Bulk cargo like grain is often unloaded like this [1]: doors on the bottom of the wagon that allow dumping the cargo next to the rail, or in some configurations below it. Loading happens by dumping stuff in from the top. Now it doesn't take much to make a structure to have one train drive below and lightly to the side of another, enabling one train to dump their cargo into the other. The problem with all those solutions is that they have to be built, and before the war Ukraine had little reason to invest. Shipping bulk goods by ship was cheaper, thus train infrastructure for them was neglected. It's the same story as Europe underinvesting in port infrastructure for unloading oil and lpg because in peace time pipelines were cheaper. 1: https://thumbs.dreamstime.com/b/unloading-crushed-stone-railway-car-bulk-cargo-wagons-high-platform-work-149370179.jpg https://thumbs.dreamstime.com/b/unloading-crushed-stone-rail...
- sschueller 4y agoThat seems like an over complication when you have automatic gauge adjustment system [1] (already in use) that can change the cage while the train travels through it at 15 km/h. At the same time you can easily build locomotives to run on electricity of any voltage and also diesel at the same time. Also changing locomotives at boarders is quite common in Europe so even if you can't get the locomotive to work you can switch them easily. We have a light rail here in Zürich Switzerland that is a Tram while in the city and a Train when it is outside. It switches from 600V to 1200V and back halfway through the journey and it does this all day long without any issues. [2] [1] https://de.wikipedia.org/wiki/Spurweite_(Bahn) https://de.wikipedia.org/wiki/Spurweite_(Bahn) [2] https://en.wikipedia.org/wiki/Forch_railway https://en.wikipedia.org/wiki/Forch_railway
- avianlyric 4y agoThose systems have some pretty tight weight limits on them, which makes them unsuitable for freight usage. I believe this approach, and why doesn’t work, is covered in the article.
- sschueller 4y agoAccording to [1] (German) DB and PKP have Gage changing system for loaded cargo trains which work similar to regular ones but require a much longer and slower process in order to deal with the extra weight. [1] https://de.wikipedia.org/wiki/Umspurung_(Eisenbahnfahrzeug) https://de.wikipedia.org/wiki/Umspurung_(Eisenbahnfahrzeug)
- ajuc 4y agoPoland has its own system like that https://en.wikipedia.org/wiki/SUW_2000 https://en.wikipedia.org/wiki/SUW_2000 But different standards aren't the main problem. The main problem is lack of trains to move that much grain.
- andbberger 4y agoan automated system already exists https://www.youtube.com/watch?v=ZiH4kt14yGw https://www.youtube.com/watch?v=ZiH4kt14yGw
- notatoad 4y agoarticle: with Ukraine using 1,520 mm gauge, all cargo has to be transferred to different trains at the Ukraine-EU border HN: why don't they just build a system to transfer the cargo to a different train? That would solve it
- ajuc 4y agoThere are many solutions, including a much simpler ones like cars that can move on both standard and wide gauges https://en.wikipedia.org/wiki/SUW_2000 https://en.wikipedia.org/wiki/SUW_2000 Or automatic unloading of this kind: https://www.youtube.com/watch?v=ZzG-pizgqUQ https://www.youtube.com/watch?v=ZzG-pizgqUQ Imagine this but with grain instead of sand and over a Vistula river where ships going to Gdańsk are waiting. But the main problem is too few trains. Sea transport is so efficient compared to rail, that combined Polish and Ukrainian cargo trains are far too few in number to move all that grain in time. You'd have to buy order of magnitude more trains.