Sounds like the manager was in over their head. Engineering team will always have items that are very hard to estimate without doing background work. A good m
by mugsie 4y ago
Sounds like the manager was in over their head.
Engineering team will always have items that are very hard to estimate without doing background work.
A good manager would have said "what do we need to do to figure out times?" and then "Can we timebox that research to a sprint / two sprints / etc?" are reported the horizon one timescale up.
- hunglee2 4y agooh yeah sure, the guy was out of his depth, scrambling for numbers to support the story he was telling upstairs