3 ms·
Pumped hydro doesn't require a stream, since it isn't harvesting energy from a preexisting flow of water.
by pfdietz 4y ago
Pumped hydro doesn't require a stream, since it isn't harvesting energy from a preexisting flow of water.
- WalterBright 4y agoHow are you going to create a large enough pond?
- ncmncm 4y agoMaybe read up? When you just make shit up as you go along, you say dumb things.
- WalterBright 4y agoAsking a question is not making things up.
- pfdietz 4y agoThis involves moving earth in places with suitable topography. The economics depends on both the vertical offset between the two reservoirs, and how much earth has to be moved per unit of reservoir volume. Algorithms have been created to use GIS data to automatically find potential PHES sites. There are lots of candidates. Australia, for example, has 300x more potential that it would need for a 100% renewable grid. http://re100.eng.anu.edu.au/global/ http://re100.eng.anu.edu.au/global/
- ncmncm 4y agoOften there is already a depression you can use as is. Or deepen, and use the excavation for a dike. If not, maybe there is a box canyon you can close the end of with a dam. In places, they have flattened a convex hilltop and used the material to make a dike. Usually you don't need anywhere near as much storage volume as a typical hydroelectric dam reservoir holds.