3 ms·
Also a lot of jobs have enough flex hours and vacation that it's close enough to 4 days/week anyway. The downside of shorter workweeks is it may cause a loss o
by paulpauper 4y ago
Also a lot of jobs have enough flex hours and vacation that it's close enough to 4 days/week anyway.
The downside of shorter workweeks is it may cause a loss of productivity at the endpoints of the week. For example, there is often a marked slowdown on the Thursdays and Mondays before and after 3-day weekends. So you are not just losing an extra day but more like 1.5 days due to slowdowns and loss of productivity.
- hamandcheese 4y agoBy this logic, we all have a 2.5 day weekend now. Which is probably true for many of us, at least from time to time.
- entropy47 4y agoFriday afternoon and Monday morning are already pretty ineffective - the length of the weekend might not impact the existence of those bookend periods. I suspect it gets worse around public holidays because that's a break from routine.
- DoughnutHole 4y agoBreak from routine, plus presumably a tendency on long weekends for people do things that impact their energy for days after, like travel or excessive drinking. If every weekend was a three day weekend I don't imagine you'd see so much of this.
- chrismatheson 4y agoNot that I disagree with what your saying, for me however there is a difference between feeling like your "skiving" and having real time off. I may duck out a bit sooner than 5pm on a Friday afternoon, but its not the same as taking Friday and going for a walk somewhere with no reception sort of thing.