but they will bid out the entire install and possibly even design. Gas pumps come in multiples of 1 or 2 but gas station design & construction happens in larger
by InefficientRed 4y ago
but they will bid out the entire install and possibly even design. Gas pumps come in multiples of 1 or 2 but gas station design & construction happens in larger units of pumps & aren't bid in a "pick any multiple of 1 or 2 pumps" way. Does that make sense?
- wumpus 4y agoIt makes sense that there's an economy of scale, and standardized designs are good, but the number 4 doesn't seem to be special in any way.
- InefficientRed 4y agoRight, I don't think it's special, other than perhaps as "this is the absolute minimum of chargers we'd ever want to put in a single place, and we're good with multiples of 4".