3 ms·
You forgot the 15 CAB calls and Change Requests, PTWs and the general wall of ITIL process drag that you need to get through to get the machine racked, stacked,
by bradwood 4y ago
You forgot the 15 CAB calls and Change Requests, PTWs and the general wall of ITIL process drag that you need to get through to get the machine racked, stacked, powered and brought online
- easytiger 4y agoYea days of paperwork. I was doing the Hollywood version
- bradwood 4y agoAnd then the SPF module gets patched into the wrong port. Server guys blame network guys. Network guys blame DC guys. Switch goes apeshit because of a spanning tree problem. IPAM not up to date. Tempers and more CRs. Did that shit for waaay to long. Now I do terraform.
- balex 4y agoWe actually know how to solve that. What we haven't figured out yet is who's the buyer.