Planning is for doing
- guiriduro 4y agoThe author thinks the parable they heard concerning silly traffic priority negotiation would be too horribly impractical to occur in real life; but they clearly have never been on a winding (mostly) single lane coastal road in Southern Italy, e.g. Amalfi. Silly and impractical negotiation between drivers is exactly how it works, or rather, doesn't. Although in this case it manifests the complete absence of planning rather than too much (the point of the article), because nobody sane would plan to allow tourist busses to travel bi-directionally on a geographically-constrained winding road that barely enables small cars to pass two abrest in many places.
- antiframe 4y agoI understood the parable differently than you. The Amalfi coast is not the same as a small town main street in the United States. The crux of the parable is that planning and negotiation is useful when it its cost is outweighed by the benefit and not useful if it's more costly than the gains.
- ElevenLathe 4y agoI work in crisis management, sometimes on tense, hours-long outage calls. Very often, engineers or others on the call will say things like "It would be nice to run test $x before we move forward." It basically always pays to ask a counter-question like "Will we want to change our action in some way based on the result of this test?" Often the answer is no, so we can skip doing the test and get to remediation faster. Once you notice this pattern (it's clearer in outage situations where moments matter), you frequently catch people (including yourself, if you're honest) seeking information that they don't even /plan/ to use as an input to some decision or action. In other words, there is no conceivable future where the answer to some proposed question would have an effect on their actions. If you find such a situation, you can at minimum remove answering that question from the critical path, and possibly just never bother finding the answer at all. That doesn't mean that having such information is bad, just that we should think of the cost of gathering suit against its likelihood of mattering in terms of our actions. In fact, possibly one of the central purposes of IT broadly is to lower the cost of answering such questions, so that we can afford to ask more of them.
- exmadscientist 4y ago> question like "Will we want to change our action in some way based on the result of this test?" This is my absolute favorite question. I am continually amazed at how much crap it can cut through.
- infogulch 4y agoMy favorite when making long term decisions is "Do we need to make the decision between these choices now, or can we proceed keeping all the choices open and make the decision later?" Sometimes there's a belabored debate between two choices and answering this question can reveal that the choices don't have to branch right now, that they have (or could have) a shared 'path prefix', enabling us to make the choice later when we have more information.
- Cerium 4y agoThe optimal time to make a decision is the moment before it hits the critical path. Where I work we make this actionable by saying to defer decisions and pull forward unknowns.
- mathgorges 4y ago100% agree with this. You never know what you’ll know in the future :) The phrase “delay the decision to the last responsible moment” is my favorite mantra about this.
- Cerium 4y agoOh, I like that phrasing. Thanks for sharing.
- blowski 4y agoSometimes there’s an underlying agenda to these conversations. The people involved are like lions trying to find out who’s the “alpha” - they’re less interested in the decision than establishing a hierarchy in the decision-making process.
- mjr00 4y ago> Finally, the third, and most pernicious situation in which there is too much planning is when planning becomes its own end. This can happen because individuals in organizations get more reward for planning work than actually executing on it. It might be seen that the execution is the “easy part”, and can be done by anyone, whereas the grand visionary (or “architect”) is the real cause of success. I've experienced this happening due to an influx of people into an organization who simply can't execute -- middle managers come in with impressive resumes but little understanding of the problems that need to be solved. When results aren't delivered, they default to extensive planning processes because it creates an appearance of work. There's lots of tangible outputs (market studies, reams of wiki pages and documentation that are written, fancy slide decks, plenty of presentations...) yet nothing that provides actual value to customers. They know execution is the hard part, they just can't do it, so they stay in planning mode endlessly in order to provide an illusion of productivity, and to keep their job.
- jimmySixDOF 4y agoOver Planning is also an institutional response to risk. In these cases it is actually "the easy part" and so preferred by environments where any mistakes are costly. As in the "If at first you don't succeed, then Sky Diving is not for you" kind. In these cases I would not call planning an end in itself but rather a defense mechanism deployed to avoid the risk of action until absolutely necessary. Not that I justify what can become analysis-paralysis situations, but it is better to understand the beast you are dealing with if you want to navigate a path through.
- solatic 4y ago> also an institutional response to risk To further elaborate on this point, sometimes that risk is internally created. If you get negative feedback for doing something everyone agrees is valuable, negative because it's not what your manager would have chosen as the highest priority, or because the architect would have planned the implementation slightly differently, etc., then the natural response to that negative feedback is "OK, next time, let's do some more planning so that you'll be happier with the work that's being done." What makes customers happy and what makes managers happy is not always the same thing. Great organizations embrace risk. Not reckless risk, not the kind where you say "eh, this might result in two-day downtime for all our customers, YOLO", but the kind where you say "I prefer that my workers make imperfect decisions that we can fix later if we really need to so that the whole organization can move faster". 80% of the time, the decision does not need to be fixed. 80% of the remaining 20%, you don't have time to fix it, and usually, that actually works out OK, all things considered.
- Archelaos 4y agoThe William James quotation at the end should not be presented as a single one. An ellipses should only be used if they were from the same paragraph. Actually, the two parts are from distinct passages several sections appart.
- DoreenMichele 4y agoA couple of things this makes me think of: No plan survives contact with the enemy. It's a military saying but I think it applies equally to business. I think that's the whole point of rubrics about how much you need to talk to customers. When seconds count, the police are minutes away. Said by pro gun people. I'm of mixed feelings about that but I still like the saying very much to encapsulate an idea about making hard decisions in critical situations when time is of the essence. It's similar to the military saying Sometimes, a 90 percent solution now is better than a 100 percent solution later.
- pqwEfkvjs 4y ago> No plan survives contact with the enemy. I've also heard a variation like "It is certain that the plan will fail, however, without the plan everything fails."
- hef19898 4y agoOr "Failing to plan means planning to fail".
- I_complete_me 4y agoWhen Mike Tyson was asked by a reporter whether he was worried about Evander Holyfield and his fight plan he answered; “Everyone has a plan until they get punched in the mouth.”
- hef19898 4y agoAnd both sayings are correct
- ChrisMarshallNY 4y agoI’ve developed a way of working, where I start with a “rough napkin sketch,” and begin writing, quite early[0]. I also try to get a high-quality (but incomplete) working prototype available as quickly as possible. A very important part of my process is the “don’t try this at home, kids” part. It requires a great deal of architectural and implementation experience. Lots of scars and a pronounced limp. If I describe this to folks, they tend to freak out, but it works on my machine… [0] https://littlegreenviper.com/miscellany/forensic-design-documentation/ https://littlegreenviper.com/miscellany/forensic-design-docu...
- anotherevan 4y agoThe driving parable reminded me of my one and only time driving in the USA. The thing that absolutely did my head in was the intersections with four-way stop signs. There was no clear indication of who had right of way which I would have thought would cause a lot of collisions. It just seemed like the biggest bully goes first. Give me roundabouts any day.
- wreath 4y agoMost people dont know how to drive in roundabouts even in cities where they are plentiful. I like how it is most of Europe; always yield to the right in the absence of signs that say otherwise (priority sign or traffic lights)
- anotherevan 4y agoI'll agree roundabouts are tricky if you are not use to them. And those giant ones in Europe look insane. When teaching my kids to drive it was one of the trickier skills they had to master - being able to read the traffic and know when they can go. Still beats those four-way stop signs though! :-)
- mikewarot 4y agoThere are a few roundabouts near my house in the Chicago Suburbs. There are stop signs at all the entrances.
- anotherevan 4y agoFacepalm.
- mordechai9000 4y agoIt's first come, first served, so you have to note who is already there when you pull up. If two cars arrive at the same time, you yield to the car on your right. Most of the time it works fairly well. If a car goes out of turn because they weren't paying attention, it's usually just a minor annoyance. I agree, roundabouts are better.
- DeathArrow 4y ago>The common way of determining right of way on roads is some combination of right of way, stop signs, and traffic lights. None of these take into account the needs of the drivers, so should characterize them as unjust. In modern societies having equal rights is 'unjust'.
- rocqua 4y agoIt often can be. But a slightly wider point of the article is that figuring out a more just process is so harmful that 'equality' turns out to be the least unjust. And that counts even if you assume everyone is honestly participating rather than selfishly manipulating the system. Once you take that into account the least unjust approach quickly becomes equality.
- erikpukinskis 4y agoThe author is suggesting replacing a bad plan (everyone discuss each intersection) with another bad plan (just drive however you like). (And as an aside, stopping at each intersection to discuss is not ideal, but at least no one is going to die.) Anyway, I’m unconvinced. Most of the planning failures I’ve seen came about because people were bad at planning, not because they were talking too much. I’ve seen the opposite (not enough talking, not enough looking ahead) far more often. I do like the slogan though. Planning is for doing.
- YokoZar 4y ago>The author is suggesting replacing a bad plan (everyone discuss each intersection) with another bad plan (just drive however you like). The author is suggesting replacing it with the normal rules of the road, which are as close to not planning as possible (following basic heuristics like go on green). The example in the parable didn't have "unjust" stop signs or traffic lights for a reason.
- layer8 4y agoActually, I would say that coming up with the rules constitutes planning, whereas negotiating who drives first each time constitutes a comparative lack of planning (and of rules). To me the parable rather demonstrates a case where planning (to decide actual rules) would be worth the extra time, because it saves time each time the rules are applied. The parable thus didn’t work for me, although I largely agree with the conclusion.
- 12thwonder 4y agogood article. my questions now is how can we avoid over-plannings and under-plannings? a lot of time I feel like the diminishing return of a planning is pretty steep for many situations but it's hard to tell how much time we should spend for the planning beforehand. (this is a planning for planning and maybe this itself is over-planning lol).
- wellpast 4y agoWhat is the name for the fallacy in which you make an analogy that does not reflect the real-world territory at all, and then draw a conclusion from it? “Doing” is not at all enough. (Well, it shouldn’t be.) Peer into any random engineering org and you’ll inevitably find loads of engineers driving around in circles with the wind in their hair, smiling with a sense of how “fast” and productively they’re moving!
- ethanwillis 4y agoIt is the most common way of trying to cope with novelty: by means of metaphors and analogies we try to link the new to the old, the novel to the familiar. Under sufficiently slow and gradual change, it works reasonably well; in the case of a sharp discontinuity, however, the method breaks down: though we may glorify it with the name "common sense", our past experience is no longer relevant, the analogies become too shallow, and the metaphors become more misleading than illuminating. This is the situation that is characteristic for the "radical" novelty. On the cruelty of really teaching computing science Edsger Dijkstra https://www.cs.utexas.edu/users/EWD/transcriptions/EWD10xx/EWD1036.html https://www.cs.utexas.edu/users/EWD/transcriptions/EWD10xx/E...
- matesz 4y agoThis issue is discussed by Donald Knuth in one of his interviews [1]. "I know that every large project has some things that are much less fun than others; so I can get through the tedium, the sweeping or whatever else needs to be done. I just do it and get it over with, instead of wasting time figuring out how not to do it. I learned that from my parents. My mother is amazing to watch because she doesn't do anything efficiently, really: She puts about three times as much energy as necessary into everything she does. But she never spends any time wondering what to do next or how to optimize anything; she just keeps working. Her strategy, slightly simplified, is, "See something that needs to be done and do it." All day long. And at the end of the day, she's accomplished a huge amount." - Donald Knuth [1] https://shuvomoy.github.io/blogs/posts/Knuth-on-work-habits-and-problem-solving-and-happiness/#:~:text=I%20know%20that,a%20huge%20amount https://shuvomoy.github.io/blogs/posts/Knuth-on-work-habits-.... [2] https://www.explainxkcd.com/wiki/images/d/d5/optimization.png https://www.explainxkcd.com/wiki/images/d/d5/optimization.pn...
- pqwEfkvjs 4y agoDon't think, just execute
- navane 4y ago"None of these take into account the needs of the drivers, so should characterize them as unjust. For example, one driver might be late to catch their flight (costing them hundreds of dollars), while another might be on a leisurely cruise around town with no particular destination." I don't know how to put this into words, but I hate that "doing nothing" is equated by being worth less, or less urgent, or having less rights. Your emergency is not my urgency, or something along those lines. If I choose to live slow leisurely, I shouldn't loose any rights over it.
- leaflets2 4y ago> Your emergency is not my urgency It'd also always give right of way to people who postpone doing things until the last minute (so that they're always in a hurry ... Hmm I feel a bit guilty). Which isn't the best incentives to build society on
- teekert 4y ago“The system in the parable is clearly more just” Only if you believe “need” should trump all other considerations. One can argue whether that is the way. I’d say it’s quite an assumption to build on.
- agumonkey 4y agoMost of the time planning means "exploring" here lies the issue.
- closeparen 4y agoMy organization has this disease bad. It’s awful. It’s so ingrained that our official leveling competencies stop recognizing differences in execution skills (coding, debugging, etc) after 2-4 years into a career. All growth from there on out is planning, design, vision, influence, leadership. This design might have made sense in a world with voracious hiring of junior talent to do the execution. But hiring has slowed and had shifted towards more senior roles even before it slowed. So we are awash in grand plans and perpetually short of resources to execute them. Those who do get stuck executing plans are of lower than average skill, since the competent implementers are promoted to planning. So even if you can get resources for your grand plan, chances are it will be executed badly.