3 ms·
Trains can transport way more people than usual planes though. Not even the largest A380 are comparable to ICE4 which are presumably going to be used on this r
by KptMarchewa 4y ago
Trains can transport way more people than usual planes though.
Not even the largest A380 are comparable to ICE4 which are presumably going to be used on this route.
https://www.dropbox.com/s/v15f0ux8dk07ap7/ICE4.pdf?dl=0 https://www.dropbox.com/s/v15f0ux8dk07ap7/ICE4.pdf?dl=0
>Also, planes (and rockets) are _kind of_ simple when compared with trains or cars.
In which context? I very much doubt that maintanence costs are similar or even cheaper for planes - for one, the plane maintanence has to be more thorough.
Also, I would say that electric engines for trains are relatively simple compared to jet engines.
Even cost supports this thesis: Poland bought 400-seat Pendolino for 400 millions for 20 trains.
Comparable 777 costs 400 million... for one plane. 737s start from 100 million.
What's expensive is infrastructure.
- maratc 4y agoA 777 can take you from Warsaw to New York, which no train can do in any time. For a cost of 737, you can have five trains. But a 737 can make a 1000 km flight, be back, make another 1000 km flight, and be back — in the time it takes a train to make one-way 1000 km ride. Your points are valid, but it takes more 400-seat trains to provide for a good intercity connection where one plane can do it. Additionally, in the time the plane flights from point A to point B, the air has lots of space to accommodate other planes. But trains need to share the limited tracks resource — e.g. one one-way tracks, you can't have two trains going in opposite directions, or they will crash into each other. We have a one-way regional rail line that has double tracks only on the stations, so that's where the trains can pass one another. A failure of any train to be there on time wrecks the whole day schedule.
- maratc 4y ago> What's expensive is infrastructure. Seems to be the case: > In 2011-2015 the Warsaw-Gdańsk-Gdynia route underwent a major upgrading costing $3 billion, partly funded by the European Investment Bank, including track replacement, realignment of curves and relocation of sections of track to allow speeds up to 200 km/h (124 mph), and modernization of stations. Note it was an "upgrading" of existing tracks.