3 ms·
yes so 5 billion per plant and ~4 year construction time. However some of this cost might be a lucrative margin for russia? The estimated construction cost of a
by SemanticStrengh 4y ago
yes so 5 billion per plant and ~4 year construction time.
However some of this cost might be a lucrative margin for russia?
The estimated construction cost of a VVER 1200 on wikipedia is 1.4 billion. 1.5 with interests. The rest would be frozen money for operating the plant during its 60-80 year lifespan? Or constructions costs would be higher than estimated?
Expected annual generation is 35 billion kWh when complete.[2]
- LargoLasskhyfv 4y agoMaybe it's more expensive because it's being built in a tectonically active area? Though one of the most stable regions, or even the most stable region in Turkey. (According to the graphics from Wikipedia)