4 ms·
Everyone is different if I lead and required to be at my job 9-5 and I worked more of an engineering schedule I would do something like 20 hours days to try and
by throwaway23236 4y ago
Everyone is different if I lead and required to be at my job 9-5 and I worked more of an engineering schedule I would do something like 20 hours days to try and maximize the days off you have.
Would the work days suck? yes. But in my opinion working 8 hours a day already makes the rest of the day useless. I think in the end a schedule where you work to get it out of the way and then enjoy the time off would feel like I am taking more time off than I am working. I know every industry couldn't do this, but for some it's possible. If you get do it by pay month you could work 4 on the front and 4 on the back and get 21-ish days off for 8 days of work.