> That seems long for a 5000sqft house: I'd expect 150 days max from the time the hole is dug until the owner moves in. Maybe for a production-builder built tr
by danans 4y ago
> That seems long for a 5000sqft house: I'd expect 150 days max from the time the hole is dug until the owner moves in.
Maybe for a production-builder built tract house, although I bet a lot of those are built in parallel and not sequentially in order to maximize throughput.
But for a custom 5000sqft house, 150 days is a very tight timeline if you're not using pre-manufactured modular framing components like SIPs.