That seems long for a 5000sqft house: I'd expect 150 days max from the time the hole is dug until the owner moves in. (smaller houses would be 100 days). You d
by bluGill 5y ago
That seems long for a 5000sqft house: I'd expect 150 days max from the time the hole is dug until the owner moves in. (smaller houses would be 100 days). You didn't specify what kind of structure it is though, some types of construction need more time.
Most people who complain about people standing around have no idea what is going on. Half of the time someone is moving materials they are completely empty handed going back to the pile for more materials. In some operations there is downtime where nothing can be done, but the need to do more work will happen soon enough that you can't send anyone to a different job (concrete work has a lot of this)
- danans 5y ago> That seems long for a 5000sqft house: I'd expect 150 days max from the time the hole is dug until the owner moves in. Maybe for a production-builder built tract house, although I bet a lot of those are built in parallel and not sequentially in order to maximize throughput. But for a custom 5000sqft house, 150 days is a very tight timeline if you're not using pre-manufactured modular framing components like SIPs. Even if you did build with modular framing, consider the amount of interior detailing required on such a massive living space (probably many bathrooms and a huge kitchen). That takes a lot of time.