4 ms·
Lawyer here: It's not unusual to have "master agreements" — either negotiated between two specific parties OR agreed to as industry standards — that are "custom
by dctoedt 4y ago
Lawyer here: It's not unusual to have "master agreements" — either negotiated between two specific parties OR agreed to as industry standards — that are "customized" by agreeing to a schedule, a purchase order, or a work order. Technically, the schedule/PO/WO is the contract, and it incorporates the master agreement by reference.
Example: https://www.investopedia.com/terms/i/isda-master-agreement.asp https://www.investopedia.com/terms/i/isda-master-agreement.a... (master agreement for derivatives trading)
More discussion of two-party master agreements: https://toedtclassnotes.site44.com/Notes-on-Contract-Drafting-2021-08-21.html#master-k-read https://toedtclassnotes.site44.com/Notes-on-Contract-Draftin... (my course materials)
Incorporation by reference: https://toedtclassnotes.site44.com/Notes-on-Contract-Drafting-2021-08-21.html#incorp-ref-cmtry https://toedtclassnotes.site44.com/Notes-on-Contract-Draftin... (ditto)
- codatory 4y agoYeah; IANAL but I've spent a lot of time writing contracts for a specific vertical that have been reviewed by several lawyers, and I always built my contracts in this same structure. There would be a MSA that governs the overall relationship -- sets a baseline for what things cost and what their conditions are, and then there would be various contracts that would include the MSA by reference for enhanced or fixed-rate services. Everyone preferred this structure that I dealt with, because the total length of the contracts were dramatically shorter and the structure was much easier to read and comprehend.
- sithadmin 4y agoWhat's being proposed here seemed so odd, structurally speaking, that I didn't even consider it analogous to a master agreement + follow-on contract structure. I'm not sure the analogy is totally a fit - a master agreement should itself be a freestanding, valid contract, no? But in this case the 'base' document is incomplete and invalid. I suppose one could just add the addendum of specific terms at the end of the document and both parties sign off on everything in one go, but I certainly wouldn't want to test it in court.