4 ms·
What I can identified in the video: - point at speedometer to confirm current speed - point at master control (acceleration control) to confirm zero (likely d
by innocenat 4y ago
What I can identified in the video:
- point at speedometer to confirm current speed
- point at master control (acceleration control) to confirm zero (likely during dead sections)
- point at clock and timetable to confirm arrival/passing time
The painting at the end is likely to confirm activation of auto-breaking of ATC train control system.