3 ms·
That also assumes the other (non data center) parts of the system could take that load. I'd guess it's unlikely to have been over-engineered by 40MW. Then they'
by ukd1 4y ago
That also assumes the other (non data center) parts of the system could take that load. I'd guess it's unlikely to have been over-engineered by 40MW. Then they'd also have to have the resistive heaters, which is doubtful as they aren't needed normally.