If it’s not hardware (panels, inverters, brackets, etc) it is considered a soft cost. NREL’s model puts soft costs at 44% for a 100MW fixed-tilt utility-scale
by conradev 5y ago
If it’s not hardware (panels, inverters, brackets, etc) it is considered a soft cost.
NREL’s model puts soft costs at 44% for a 100MW fixed-tilt utility-scale plant in 2021:
https://www.nrel.gov/docs/fy22osti/80694.pdf https://www.nrel.gov/docs/fy22osti/80694.pdf
The percentage goes up as the installation size goes down, but it is not 70%