5 ms·
The time tracking is never used to evaluate engineer performance. It is only for reporting purposes, how much a project was charged vs how much it costed basica
by elevatortrim 4y ago
The time tracking is never used to evaluate engineer performance. It is only for reporting purposes, how much a project was charged vs how much it costed basically. And similar reporting. The company never looks at it at an individual level.