4 ms·
Letting perfect be the enemy of the good is not the same thing as doing a cost benefit analysis. In the authors estimation, the costs outweigh the benefits. You
by patrick451 4y ago
Letting perfect be the enemy of the good is not the same thing as doing a cost benefit analysis. In the authors estimation, the costs outweigh the benefits. You don't seem to be considering the cost of type checking at all.