2 ms·
Metro link doesn't seem to have these issues and a lot of projects are in store to upgrade that right of way (like LINK union station to permit run through at u
by asdff 5y ago
Metro link doesn't seem to have these issues and a lot of projects are in store to upgrade that right of way (like LINK union station to permit run through at union station instead of it being a stub). A lot of thought is being put into this. Using an existing right of way that can later be upgraded is sensible imo, especially when these terminii will have the highest land acquisition costs by far. The metrolink right of way from burbank into union station already has many key grade separations done. Its sensible to make use of it when its almost a direct shot as the crow flies.