3 ms·
German nuke plants (just like French ones) are load following and can go from near-zero to full load in 15-30 minutes. They are usually not used that way becau
by MagnumOpus 4y ago
German nuke plants (just like French ones) are load following and can go from near-zero to full load in 15-30 minutes.
They are usually not used that way because their base load is needed.
Also, if you do not know that, you might reflect about what other facts relevant to forming an educated opinion on the topic you are missing.