3 ms·
Container unloading is starting, using two barge-mounted cranes.[1] As expected. Two large dredges are on scene, removing mud around the ship. Donjon-Smit, the
by Animats 5y ago
Container unloading is starting, using two barge-mounted cranes.[1] As expected. Two large dredges are on scene, removing mud around the ship. Donjon-Smit, the salvage firm, sent divers down and report the hull is intact, so they'll probably be able to float the ship out after enough lightening and dredging.
All parties agree the salvage bill will be huge, and litigation over who pays for what is starting.
[1] https://www.workboat.com/coastal-inland-waterways/new-details-on-ever-forward-refloat-plan https://www.workboat.com/coastal-inland-waterways/new-detail...