5 ms·
It took around 22 years for Finland to get their latest nuclear plant operational, that's a long time to wait. https://news.ycombinator.com/item?id=30653220 ht
by sharken 5y ago
It took around 22 years for Finland to get their latest nuclear plant operational, that's a long time to wait.
https://news.ycombinator.com/item?id=30653220 https://news.ycombinator.com/item?id=30653220
Yes, the second plant should be built faster but right now nuclear energy is a very long game.
- sofixa 5y agoIt was of an entirely new design, so the long wait time was to be expected. And it's projected life is in the multiples that of any solar or wind installation, so there's that.