4 ms·
Fusion reactors are likely to have very high operating cost, due to their complexity and the difficulty of repairing them after even minor malfunctions (because
by pfdietz 5y ago
Fusion reactors are likely to have very high operating cost, due to their complexity and the difficulty of repairing them after even minor malfunctions (because all those complex innards will be inaccessible to hands on maintenance due to induced radioactivity.)
A fission reactor can operate with 2% of its fuel rods leaking. A fusion reactor will cease to operate with a single leak from a blanket module into the reactor vessel.
- willis936 5y agoEverything needs a risk assessment. If a reactor needs to shut down once a month for two months of maintenance that is obviously untenable. Nobody is arguing that. Bad engineering yields bad results. MCF devices need not be made by bad engineers.
- ncmncm 5y agoOr, indeed, be made at all. A $30 billion reactor complex, judging by recent experience with nukes, would never be completed, but would burn $100 billion before finally being cancelled. None of the money spent would be returned, afterward.