3 ms·
(E) has been going on for hundreds of years in the US is the thing. The difference is that the cost of goods used to be where the primary grift was instead of o
by devonkim 5y ago
(E) has been going on for hundreds of years in the US is the thing. The difference is that the cost of goods used to be where the primary grift was instead of on labor (T&M contracts historically). But now T&M contracts are not very common at least in DoD but there is still obviously some level of grift but it’s partly due to extremely terrible guidelines for government procurement processes leading to contractors that do the bare minimum getting more money than contractors that exceed expectations (one rare exception of this happening was during the reconstruction of Atlanta’s I-95 when contractors were getting massive bonuses for finishing ahead of schedule contingent upon safety inspections passing - all work completed months ahead of schedule).
Note that South Korea and France have nuclear cheaper than renewables still because their processes over decades have led to basically producing nuclear plants with horizontal scaling, driving costs down dramatically. In essence, all energy production within the borders of a country is a matter of political will moreso than even technical requirements. If a culture wants to push back on X and wins politically, it becomes more expensive and distorts intrinsic costs. If a culture pushes for Y and eventually subsidizes it, it becomes dramatically cheaper even below intrinsic costs and is over-consumed (see: fossil fuels)