tl;dr: don't blame the design, somebody did a crummy job of building it. Though the real money is in the conclusion: Perhaps we should not have worked for a
by jfengel 5y ago
tl;dr: don't blame the design, somebody did a crummy job of building it.
Though the real money is in the conclusion:
Perhaps we should not have worked for a fee so low that it allowed the client to sidestep the usual procedures. Perhaps when we were pushed out of the construction process we could have stepped out because we couldn't guarantee the project’s quality. This is certainly our greatest sin: we should have ended our participation precisely at that moment.
That makes sense. The project they designed would need extensive landscaping maintenance, and can't be done on the cheap.
Though I gotta say, they were picked because they'd apparently done a bang-up job on a project in Rotterdamn that doesn't look all that interesting to me. The scaffolding makes it look like it's under construction. Still, somebody liked it, and it's unclear why they went from a similar design to a "mound".
- ixfo 5y agoThe company commissioned to build it were FM Conway. That should have been a bright red flag. FM Conway do roadworks. They fix infrastructure, and rebuild streets. They're a civil engineering firm at best, not structural engineers, nor gardeners; in other words, a deeply inappropriate choice for the company to make it happen. But I would bet good money that WCC have a great relationship with them for other contracts, and I would bet good money that whoever handed out the contract got some great tea money for their site visits.
- TheOtherHobbes 5y agoSomeone - not the architects - made a lot of money on this for very little. Which presumably was always the point of the project. The fact that something was built at all makes it unusual compared to the Garden Bridge, the Bridge to Ireland, the Estuary Airport, and the rest.