4 ms·
My number one question is how they plan to dredge the seabed and keep that surface flat enough for the tunnels to sit on. connecting with millimeter precision w
by andrew_ 5y ago
My number one question is how they plan to dredge the seabed and keep that surface flat enough for the tunnels to sit on. connecting with millimeter precision would require a flat surface, no? Fascinating.