3 ms·
You say it is necessary to lower the pantograph before (and re-raise it after) a gap in the line. Isn't it possible to (say) have the line smoothly rise before
by euroderf 5y ago
You say it is necessary to lower the pantograph before (and re-raise it after) a gap in the line. Isn't it possible to (say) have the line smoothly rise before the gap - sort of lift away - high enough to disengage from the pantograph before the gap - so that the pantograph can be kept in the same position ? I'd think this would save on wear & tear and avoid accidents. How much upward pressure is applied by a pantograph anyways ?
- ErikCorry 5y agoA lot of the gaps will be there because there is not enough head room for the wires. In that case whatever caused the missing head room would rip off the pantograph. Since you need the pantograph-lowering feature anyway you might as well use it everywhere and avoid having to build the smooth-rising smooth-lowering cables.
- euroderf 5y agoThis sounds like it might be railway-dependent but yes, I see your point.