2 ms·
Given the water intrusion it is a full rebuild and a lot of renovation ... but on the plus side if you wanted a bunker $380k for 11 acres plus all the concrete
by LinuxBender 5y ago
Given the water intrusion it is a full rebuild and a lot of renovation ... but on the plus side if you wanted a bunker $380k for 11 acres plus all the concrete and digging already done might be a good deal. I would get it inspected for cracks. Cracks will have to be fixed correctly or mold will be a serious health problem. It looks to be in better shape than some remote military sites I worked at given the age. Assume 100% of heating and electrical needs to be replaced. Flush every toilet and have the septic inspected. I wont disgust anyone out with those stories.
Most importantly it would also need to be inspected for chemical contamination both in the facility and in the soil. Many of the sites I worked at had to be entirely destroyed and all the soil chemically treated costing millions in treatment alone with drilling and pump trucks. Ask to see the paperwork from the military from when this property was transitioned.