3 ms·
The biggest problem with nuclear isn’t waste management, fuel procurement, nimby, not even black swans. The top problem is that if we commission enough nuclear
by baq 5y ago
The biggest problem with nuclear isn’t waste management, fuel procurement, nimby, not even black swans. The top problem is that if we commission enough nuclear plants today, they won’t produce the first watt until after it’s way too late to prevent catastrophic climate change. It could have been a solution 20 years ago, now you can build, operate and decommission a wind farm or solar plant in the time it takes to design and build a nuclear reactor.
- zbrozek 5y agoThat's a problem of our own making, and we could revert. The timelines are driven by permitting (both at the local level and at the NRC) and the customization of each reactor. We desperately need reactors to roll off of an assembly line to drive down physical costs. And we also desperately need to trim down the regulatory burden. Together, those changes would dramatically speed up deployment and cut costs. This was an interesting essay and I will probably read the book it is reviewing: https://rootsofprogress.org/devanney-on-the-nuclear-flop https://rootsofprogress.org/devanney-on-the-nuclear-flop