4 ms·
A typical pattern I saw was a team adds a new flag, then gradually rolls it out. Once done the removal is added to the backlog. “High priority” bug fixes and fe
by yojo 5y ago
A typical pattern I saw was a team adds a new flag, then gradually rolls it out. Once done the removal is added to the backlog. “High priority” bug fixes and feature work gradually moves the ticket down in the system. Two months later a reorg happens, the team no longer exists, and the work is lost.