4 ms·
I'm US based, so any formulas I come up with tend to be in Imperial, not metric. Bad jokes aside, do you want bugs committed before a set date to be ignored in
by taxcoder 5y ago
I'm US based, so any formulas I come up with tend to be in Imperial, not metric.
Bad jokes aside, do you want bugs committed before a set date to be ignored in the calculation, or receive a lower weight?
- siavosh 5y agoSo for example, every bug before today considered 'old', with any new bug after being 'new'. New bugs create a penalty in the metric, while the rate of reduction of old bugs is what's to be optimized for while not disincentivize the reporting of 'old' bugs. Hope that makes sense. I have some rough ideas, but I'd like to hope there's some battle tested formulas out there...
- taxcoder 5y agoNothing battle-tested, but an interesting question. I'll bow out, because all I have is the rambling incoherence of a bizarre mind.