> It's hard to make a fission reactor both large enough for commercial scale and safe without cooling. Gen IV reactors all fit that bill. They all have passi
by cogman10 5y ago
> It's hard to make a fission reactor both large enough for commercial scale and safe without cooling.
Gen IV reactors all fit that bill. They all have passive safety properties (so, cut the power and the plant shuts down, no nuclear meltdowns) and they have very large outputs (2GW in the largest plants).
> The second benefit is not producing high level radioactive waste. With fission you can't really get away from the decay products of your fissile materials, they're intrinsic to the process.
Again, Gen IV reactors are much better than previous reactors in this aspect. While they do produce radio active waste, it's generally far more used (producing less waste) and radioactive for a far shorter time (hundreds of years vs 1000s).
> The regulatory framework is a real concern, depending on how many rules carry over from fission reactors.
This is the big sticking point that hurts the bottom line of fission reactors and will hurt fusion reactors. Without changes to the laws, nuclear power plants are going to have a rough time turning a profit. They mostly aren't unprofitable because of construction cost, but rather regulatory overhead.
It takes over 10 years to construct and turn on new reactors in the US, which is a major problem.
- baq 5y agoOnly 10? Do you have a source for that? I seriously thought it’s more like 20.
- cogman10 5y agoYou are probably right. I'm relying on my fuzzy memory for that number (I've looked it up in the past). This article [1] says 5 years to license, 5->7 years to build, and then the verification time with the electric company before it can be switched on. [1] http://large.stanford.edu/courses/2017/ph241/park-k2/ http://large.stanford.edu/courses/2017/ph241/park-k2/