4 ms·
My job involves a lot of meetings, and also doing a lot of IC work. What works for me is to take 2-3 hrs every week thinking through all the IC work I need to d
by spot5010 5y ago
My job involves a lot of meetings, and also doing a lot of IC work. What works for me is to take 2-3 hrs every week thinking through all the IC work I need to do and breaking it down into chunks that can be completed in 6-8 1 hour blocks of time. That’s the longest block of time I can hope to find without any interruptions. I break things down to the level that I can write the commit message for the changes I’m about to make. Then I use to time slots to make the changes.
- DrAwdeOccarim 5y agoI like this idea. Thanks!